Terms &
Conditions
Terms & Conditions
Validity:
(1)       (a)
Unless other terms and conditions are expressly accepted by us by means of written amendment to these terms and conditions signed by one of our Directors and referring specifically to the term or condition to be amended, the Contract should be on the terms and conditions set out below and over leaf (thereinafter together called “the Contract Terms”) to the exclusion of any other terms and conditions whether or not the same are endorsed upon delivered with or referred to in any purchase order or other document delivered by the Purchaser to us. Any reference to the Purchaser’s Order, Specification or like document shall not be deemed to imply that any terms or conditions endorsed upon delivered with or referred to in such Order, Specification or like document shall have effect to the exclusion or amendment of the Contract Terms.
Limited Guarantee:
(2)       (a)


            (b)



            (c)
We will not however, be liable to repair any materials if any identification or serial number thereon has been altered, defaced or removed or if the material has not been properly handled or has been subjected to any misuse.

Save as foresaid, we will in no circumstances be liable for any loss or damage of any kind whatsoever caused directly or indirectly by any defect in material or workmanship or any defect in the goods or services supplied or by any negligence on the part of any if our servants and agents and all warranties and conditions express or implied statutory or otherwise are hereby expressly excluded.

No guarantee is given by FRP in respect of the works as specified in this contract, unless guarantee is added as a special condition hereto.
Price:
(3)       (a)


            (b)


            (c)
FRP reserves the right to increase their cost where such increase is caused by circumstances beyond their control, and the client is liable for such cost increases.

The Quotation is conclusive and does not include any item not expressly stated. Any additional items are chargeable to the client on a cost plus basis. The cost of unused paint is chargeable to the client.

No guarantee is given by FRP in respect of the works as specified in this contract, unless guarantee is added as a special condition hereto.
i         Transportation of materials to and from our blasting shop;
ii         The cost of inspection or calibration of Machinery/Equipments;
iii         Any changes in the application methods or paint material requested by the client are deemed as a deviation from the original quotation and            any increased costs as a result of the deviation(s) shall be borne by the client;
iv        Special Machinery/Equipment or Consumables, unless expressly stated in the Quotation, are excluded, and the client is to bear the cost of            these, where necessary or requested;
v         The cost of special paint colours, except where expressly stated in our Quotation; and
vi        The cost of additional coats of paint, which are to be borne by the client, since upon achieving the specified DFT (Dry Film Thickness), certain           colour shades chosen by the client may not have sufficient opacity
SHE Specification and Requirement:
(4)       (a)


            (b)


            (c)


            (d)

            (e)
FRP will only work in sites whereby the conditions are safe and not compromised. FRP will not commence work in any site FRP considers to be hazardous.

All supplies of Personal Protective Equipment (PPE) and safety related equipment shall be in accordance with the standards of the relevant regulatory practices and policies (such as the Ministry of Manpower (MOM) Code Of Practice).

FRP requires the client to obtain relevant insurance coverage including Third Party and Workmen’s Compensation to cover FRP’s workers during site operations, and FRP shall have the right to demand a copy of the said insurance coverage prior to commencing work.

FRP retains the right to reject without prior consultation heavily pitted, contaminated, laminated and oily materials especially cold rolled items.

Finished painted goods must be collected within two (2) working days.
Acceptance Of Quotation/Validity:
(5)       (a)
Upon acceptance, this Quotation shall be exhaustive and comprehensive and shall not be varied by any representation warranty or otherwise, whether prior to or subsequent to the acceptance of the Quotation, unless both parties agree in writing to an alteration or amendment of the terms of the Quotation.
Compliance With Law:
(6)       (a)
This agreement is governed by the laws of Singapore.